Comments:
Pooir quality materials and shoddy workmanship.
Primary contractors, sub contractors,prior's ractors, etc. There was a titular responsibility of the primary contractor's subcontractors but as the chain freom primary extended downward to successive subcontractors the accountability was not good. Workmanship was often shoddy. Quality of materils often saub-0standard. Windows were often ill fitting. No optional choices for windows. The Andero windows were not able to be cleaned from insidwe of home. They did not tilt. For older purchasders in an over 55 community this was a disappointment. Upgraded hardwood were expensive and even with two upgrades the floor slatswere very thin. They not installed very well. Theyt had to come back twicew to replace3 floor boards. Finish of floors was marred by some stain or paint that fwll on a porion, was wiped up but could easily be seen as not right. The upgraded Heating/AC system was not installed with all the upgraded featuires o[perable. Furrther the Aprilaire was installed without a tap beeing made in the cold water line for humidity source. This was not discovered un til the annual tune-up. There were many less critical shoddiness. The vinyl siding (no upgrade choices) were installed in a poor workmanship maNER AND DURING A MEDIUM WIND STORM MANY OF THE SIDING STRIPS CAME LOOSE. This has been a major problem for someowners. The stromk water drainage was p[oorlycompleted. I could gfo on but I won't If you want to talk to me or othe homeowners I'd be glad to do so.